Courthouse Logo
Department header image
Utilities Water Resources
1026 West Broadway Ave
Public Works Bldg. 4th Floor
Spokane, WA 99260
Contact Us
(509) 477-3604
Print this page 
Email this page to a friend 

Your questions, comments, and suggestions about this page help us evaluate how well we are doing at providing clear and concise information.

The suggestion field is required. Please provide an email address or contact information if you would like a response.



Print this pageSend us a question or a comment about this pageEmail this page to a friend

Coordinated Water System Plan

The Spokane County Coordinated Water System Plan (CWSP) was created for water utilities to coordinate their planning and construction programs with adjacent water utilities and other local jurisdiction programs such as comprehensive planning done under the Growth Management Act.  The CWSP was developed according to RCW 70.116, Public Water System Coordination Act, enacted in 1977 and modified in 1991.

Provided below are the CWSP document and maps of the service area of each water utility.  There are two versions of each map - one with parcel information and one without.  These maps represent the service area boundaries as of March 16, 2010.






 

 

CWSP History 

In 1982, Spokane County completed the first Coordinated Water System Plan (CWSP) for the Critical Water Supply Service Area (CWSSA) within Spokane County. The CWSP was updated in 1989 and again in 1999. That document was prepared in accordance with the provisions of the Public Water System Coordination Act, Chapter 70.116 RCW. The Act specifies that a Critical Water Supply Service Area (CWSSA) be designated, and that a CWSP be prepared and updated every 5 years to address issues of regional interest and incorporate individual Water System Plans for public water systems within the area. The 1982 CWSP established service areas for public water utilities, minimum design standards, Utility Service Review Procedure (USRP), a conflict appeals process, and regional supply needs associated with wholesale supplies for the West Plains interties, water rights, and satellite system management.

In 1989, the CWSP was updated. During preparation of the Update, a Preliminary Assessment was conducted by the Water Utility Coordinating Committee (WUCC). It was submitted in December, 1987, to the County Commissioners recommending that the CWSP process be expanded to include other areas which were precluded from the original CWSP. The majority of the new territory was in the north Spokane County area. The easterly boundary was also expanded to the County line. Only slight expansion occurred to the south. Subsequent to public hearing conducted during the spring of 1988, the study boundary was expanded to include these new areas. The areas included in the CWSP preparation were CWSSA No. 1 - North Spokane; CWSSA No. 2 - City of Spokane; CWSSA No. 3 - Spokane Valley; and, CWSSA No. 4 - West Plains. Therefore, the procedures incorporated in the original CWSP and refined accordingly in 1989, are applicable to the expanded CWSSA areas.

The CWSP and its update also became the Water General Plan for Spokane County, as specified in Chapter 39.94 RCW, the County Services Act. In addition to the CWSP, the County has prepared a Comprehensive Wastewater Management Plan (CWMP) to guide the development and provision of sewerage services throughout the urbanizing area. In combination, these documents facilitate the coordinated provision of water and sewer service and provide a structured approach to water resource management throughout the area.

In 1997, another update of the CWSP was initiated. In addition to updating the original topics included in the 1982 and 1989 plans, the 1999 CWSP update addresses regional resource issues, such as water conservation and wellhead protection. The 1999 update is now available on this site.  

Back
to
Top