Little Spokane Drive Bridge No. 3704 Replacement

Project No:  CRP 3266 and CRP 3267

Project Manager: Mick Flugel

Project Design Engineers: Mike Duke, Jaylene Atha

Project Timeline: 2023 construction

Project Description: This project will replace the existing 3 span concrete bridge with a single span prestressed concrete bridge.

Project Update: Preliminary bridge layouts are being developed to establish roadway alignment, scheduled to be in Right of Way in winter 2021, finish design in 2022 and construction in 2023.

Project Funding: Federal bridge funds