Road Construction and Maintenance Update
August 28 to September 4, 2020
ROAD CONSTRUCTION
Bigelow Gulch Phase 5
Progress road is closed for excavation. Completed: 9/30/2020.
Progress Rd: from Forker Rd to Forker Rd
The road is closed and a detour is in place.
Espanola Road - Railroad Crossing Safety Improvements
Railroad Crossing Improvements include a small amount of widening and new guardrail. BNSF will also install new safety equipment for the railroad. Completed: 9/15/2020.
Espanola Rd: from BNSF Crossing #40021 to Manila Rd
Flaggers may be present in both directions with lane restrictions. Motorists should also down and use caution in the work zone.
Geiger Blvd – Soda to Grove Rd
Geiger Blvd. is closed from Soda to Electric – however local businesses remain open. Crews are removing the existing roadway. The project includes new drywells, asphalt, signing and pavement markings. Completed: 11/30/2020.
Geiger Bv: from Soda Rd to Spokane City Limits (Electric Ave)
Motorists should use an alternate route. Electric Avenue is open. Thomas Mallon is open. Please slow down and use extreme caution when travelling inside the work zone.
North Kentuck Trail
Crew is repairing bridge scour damage. Start: 9/1/2020 – Completed: 10/30/2020.
North Kentuck Trails Rd : from West Bradshaw Rd to Keevy Rd
Motorists should expect delays in both directions and all lanes. Watch for flaggers north of Bradshaw Road.
PRIVATE CONTRACTOR WORK BY PERMIT
Install Overlash Fiber
Comcast is using Sefnco Communications (509-532-8308) to install an overlash fiber and route underground in the existing conduit. The project starts at the northwest corner of 57th going south across 57th and along the west side of Regal. Completed: 9/30/2020.
57th Av: from Regal Rd to Regal Rd
Motorists should slow down and watch for flaggers in both directions – especially at the intersection of 57th and Regal and on Regal south of 57th.
Liberty Lake Eastside Water Improvements
Halme Construction (509-725-4200) is replacing the water line on Neyland. Completed: 9/30/2020.
Neyland Rd: from Lakeside Rd to Gage St
Road closed for water line replacement.
Buried Comcast Service
Prince Telecom, Inc. (509-489-4769) is boring 120-feet beginning at the pole on the northeast corner of 5708 Custer St. property and then boring south and west. Completed: 9/5/2020.
Custer St: from 57th Av to 57th Av
Motorists should expect lane restrictions southbound and the shoulder will be closed on Custer near 57th.
Install new Riser and Trench Conduit
Sefnco Communications (509-532-8308) is installing a new riser and trench conduit for Comcast. The work is being done 171-feet to the edge of the driveway and a new pedestal. Is approximately 4,130-feet east of Harvard Road on the north side of Morris Road. Completed: 8/31/2020.
Morris Rd: from Garry Ln to Garry Ln
There are lane restrictions in both directions. Motorists should expect delays, slow down, and please watch for flaggers and spotters.
Underground Cable Installation
Work is being done by Quanta Telecom (713-629-7600) on the west side of Freya from 55th to 57th Avenue. Completed 9/30/2020.
Freya Street: from 55th to 57th Avenue
There will be lane restrictions in both directions with flaggers on Freya. Motorists should slow down in the work zone.
Underground Cable Installation
Work is being done by Quanta Telecom (713-629-7600). An underground cable installation of approximately 107-feet. Work will go south on the west side of Harvard. Completed 8/28/2020.
Harvard Rd: from UPRR Crossing #55031 to UPRR Crossing #55031
There will be lane restrictions and the shoulder will be closed.
MAINTENANCE
(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)
Install culvert extensions on culvert going under Sands Rd, just north of Palouse Hwy. Crews are adding extensions to the culvert under Sands Rd and just north of Palouse Hwy. Completed: 9/3/2020.
Sands Rd: from Palouse Hy to Gibbs Rd
Motorists should expect lane restrictions in both directions.
Asphalt overlay on Eloika Lake Rd from Hwy. 2 to Division Rd.
Crews are laying fresh asphalt on Eloika Lake Rd from Hwy. 2 to Division Rd. between Austin Road and Hazard Road. Completed: 9/3/2020.
Eloika Lake Rd: from Hwy. 2 to Division Rd
There will be delays in both directions. Motorists should slow down and watch for flaggers.
Cheney-Spokane Road Culvert
Crews are installing a four-foot culvert under Cheney-Spokane Rd. Completed: 9/11/2020.
Cheney-Spokane Rd: from Andrus Rd to Myers Park Rd
The road is closed and a detour is in place at Andrus Rd.
Chip-Sealing Bruce Rd from Stoneman Rd to Day-Mt. Spokane Rd.
Chip-Sealing Bruce Rd from Stoneman Rd to Day-Mt. Spokane Rd. Completed: 9/1/2020.
Bruce Rd: from Stoneman Rd to Day-Mt. Spokane Rd.
Motorists should expect delays in both directions and all lanes. Please slow down, watch for flaggers and follow the pilot car through the work zone.
Chip-Sealing Hallett Rd from Assembly Rd to West Terrace St.
Chip-Sealing Hallett Rd from Assembly Rd to West Terrace St. Completed: 9/8/2020.
Hallett Rd: from Assembly Rd to West Terrace St.
Motorists should expect delays in both directions and all lanes. Please slow down, watch for flaggers and follow the pilot car through the work zone.
Chip-Sealing Hawthorne Rd from Parksmith Dr to Market St.
Chip-Sealing Hawthorne Rd from Parksmith Dr to Market St. Completed: 9/3/2020.
Hawthorne Rd: from Parksmith Dr to Market St.
Motorists should expect delays in both directions and all lanes. Please slow down, watch for flaggers and follow the pilot car through the work zone.
Chip-Sealing Parksmith Dr from Market St to Stoneman Rd.
Chip-Sealing Parksmith Dr from Market St to Stoneman Rd. Completed: 9/3/2020.
Parksmith Dr: from Market St to Stoneman Rd.
Motorists should expect delays in both directions and all lanes. Please slow down, watch for flaggers and follow the pilot car through the work zone.
Chip-Sealing Stoneman Rd from Parksmith Dr to Argonne Rd.
Chip-Sealing Stoneman Rd from Parksmith Dr to Argonne Rd. Completed: 9/2/2020.
Stoneman Rd: from Parksmith Dr to Argonne Rd.
Motorists should expect delays in both directions and all lanes. Please slow down, watch for flaggers and follow the pilot car through the work zone.
Crack-Sealing Aspen Meadows Dr from Short Rd to Lois Rd.
Crack-Sealing Aspen Meadows Dr from Short Rd to Lois Rd. Completed: 9/3/2020.
Aspen Meadows Dr: from Short Rd to Lois Rd
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Belmont Rd from Linke Rd to end of pavement.
Crack-Sealing Belmont Rd from Linke Rd to the end of the pavement. Completed: 9/3/2020.
Belmont Rd: from Linke Rd to end of pavement
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Broad Ave from west end of Kari Rd.
Crack-Sealing Broad Ave from the west end of Kari Rd. Completed: 9/3/2020.
Broad Ave: from the west end of Kari Rd.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Fairview Rd from Freya St to Stoneman Rd.
Crack-Sealing Fairview Rd from Freya St to Stoneman Rd. Completed: 9/3/2020.
Fairview Rd: from Freya St to Stoneman Rd
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Gilbert Rd from Glenbrook Rd to Campbell Rd.
Crack-Sealing Gilbert Rd from Glenbrook Rd to Campbell Rd. Completed: 9/3/2020.
Gilbert Rd: from Glenbrook Rd to Campbell Rd
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Glenbrook Rd from Wellesley Ave to Gilbert Ave.
Crack-Sealing Gilbert Rd from Glenbrook Rd to Campbell Rd. Completed: 9/3/2020.
Glenbrook Rd: from Wellesley Ave to Gilbert Ave
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Grove Rd from Spokane City Limits to Mission Rd.
Crack-Sealing Grove Rd from the Spokane City Limits to Mission Rd. Completed: 9/3/2020.
Grove Rd: from Spokane City Limits to Mission Rd
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Harvard Rd from Trent Ave north to end of pavement.
Crack-Sealing Harvard Rd from Trent Ave north to the end of the pavement. Completed: 9/3/2020.
Harvard Rd: from SR-290 (Trent Ave) to the end of the pavement.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Hayford Rd from Deno Rd to Euclid Rd.
Crack-Sealing Hayford Rd from Deno Rd to Euclid Rd. Completed: 9/3/2020.
Hayford Rd: from Deno Rd to Euclid Rd
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Lois Dr from Aspen Meadows Dr to Short Rd.
Crack-Sealing Lois Dr from Aspen Meadows Dr to Short Rd. Completed: 9/3/2020.
Lois Dr: from Aspen Meadows Dr to Short Rd
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Crack-Sealing Powers Rd from Patterson Rd to Old Hwy 195.
Crack-Sealing Powers Rd from Patterson Rd to the Old Hwy 195. Completed: 9/3/2020.
Powers Rd: from Patterson Rd to the Old Hwy 195.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Culvert cleaning on Brooks Rd from Jacobs Rd to Coulee Hite Rd.
Crews will be using a Vactor Truck to clean culverts on Brooks Rd from Jacobs Rd to Coulee Hite Rd. Completed: 9/3/2020.
Brooks Rd: from Jacobs Rd to Coulee Hite Rd.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Culvert cleaning on Ritchey Rd from Charles Rd to Four Mound Rd.
Crews will be using a Vactor Truck to clean culverts on Ritchey Rd from Charles Rd to Four Mound Rd. Completed: 9/3/2020.
Ritchey Rd: from Charles Rd to Four Mound Rd.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Ditch cleaning on Arnold Rd from Cameron Rd to Valley Chapel Rd.
Crews will be cleaning ditches on Arnold Rd from Cameron Rd to Valley Chapel Rd. Completed: 9/3/2020.
Arnold Rd: from Cameron Rd to Valley Chapel Rd.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Ditch cleaning on Coe Rd from Cheney-Plaza Rd to Wentworth Rd.
Crews will be cleaning ditches on Coe Rd from Cheney-Plaza Rd to Wentworth Rd. Completed: 9/3/2020.
Coe Rd: from Cheney-Plaza Rd to Wentworth Rd.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Euclid Rd Bridge Closure
Euclid Rd Bridge is closed and a detour is in place. Replacing the bridge is the responsibility of the Burlington Northern Santa Fe Railroad.
Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd
Road Closed – Euclid Rd Bridge Closure
Shoulder maintenance on Madison Rd from Palouse Hwy to Dishman-Mica Rd.
Crews will be doing shoulder maintenance work on Madison Rd from the Palouse Hwy to Dishman-Mica Rd. Completed: 9/3/2020.
Madison Rd: from Palouse Hwy to Dishman-Mica Rd.
Motorists should expect lane restrictions in both directions and all lanes. Please slow down and watch for flaggers.
Throughout Spokane County, crews are repairing potholes, sweeping, and applying broadleaf herbicide in the right-of-ways.