[ARCHIVED] Road construction and maintenance update for May 7-14, 2021.

 SPOKANE COUNTY PUBLIC WORKS                          

ROAD CONSTRUCTION AND MAINTENANCE 

MAY 7-14, 2021 

www.spokanecounty.org/publicworks 

http://www.spokanecounty.org/3828/Weekly-Travel-Impacts-Map

 

ROAD CONSTRUCTION


Bigelow Gulch Phase 3
 Road Reconstruction (Remove and Replace), Culverts, Stormwater, Guardrail and Illumination system. Completed: August 31, 2021. 

Bigelow Gulch Road: from Argonne Road to Weile Avenue 
 
Flaggers May Be Present (Both Directions, All Lanes): Utilities are currently working in the right-of-way. 

 

  Weile Av: CLOSED from Bigelow Gulch Rd to Thierman Rd – May 10 through

  July 11, 2021.

 

Centennial Trail
 Roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control. From Nine-Mile Dam to Carlson. Completed: May 21, 2021.


Geiger Blvd - Soda to Grove Rd *****ROAD CLOSED FROM THOMAS MALLEN TO GROVE*****LOCAL BUSINESSES ARE OPEN!
 New Road, including Drywells, Asphalt, signing, pavement marking. Dowdy and Geiger Road are Open. Completed: June 30, 2021.

Geiger Blvd: from Thomas Mallen Road to Spokane City Limits (Electric Ave)
 
Lane Restrictions (Both Directions, All Lanes): Geiger at Grove is closed. Crews will be working on removing existing roadway. Use Alternate Route. Electric Avenue is open. Thomas Mallon is open. Local businesses are open, please use extreme caution when travelling inside the work zone. Spotted is closed.

 

PRIVATE CONTRACTOR WORK BY PERMIT

 

Bore Two 2-Inch Conduits with .625 COAX

Comcast and Sefnco crews will bore two tow-inch conduits with .625 COAX in E. Kiowa Court, located south of Cree Drive. Completed: May 12, 2021.

 

Install New URD SVC

Avista crews will install a new URD SVC west of Highway #395 on the south side of Wild Rose Road at 1123 W. Wild Rose Road. Completed: May 12, 2021. 

Wild Rose Rd: from US-395 to Austin Rd 
 
Flaggers may be present (both directions, all lanes): One-lane and two-way traffic control. Motorists should slow down in the work zone and watch for flaggers.

 

Light Pole Installation
 Avista crew will be installing a light pole on the north side of Charles Road west of Carlson Road. Dates: May 13-14, 2021.  

Charles Rd: from Carlson Rd to SR-291
 
Flaggers may be present (both directions, all lanes): One-Lane, Two-Way with flaggers.

 

Pole and Span Guys Replacement
 Avista crew will be replacing a pole and span guys on the east side of Market north of Magnesium Road. Dates: May 10-14, 2021.  

Market Street: from Magnesium Rd to Parksmith Drive
 
Flaggers may be present (both directions, all lanes): One-Lane, Two-Way with flaggers.

 

STA Four Lakes Station

WM Winkler crews are paving First Avenue. The project includes the sidewalks, curbs and gutters – along with demolishing part of Spokane Street. 150-feet of road will be reduced to a seven-foot wide walking path south of First Avenue. Completed: July 30, 2021.

            First Avenue: from Electric Ave. to Cheney Street.

ROAD CLOSED on First Avenue on the east and west side of Highway 904 from 8:00 a.m. to 5:00 p.m. as needed. 

 

UG and Aerial Construction
Quanta Telecommunication Services crew will be doing UG and Aerial construction along Freya St. from 55th Av to 57th Av…and on the north side of 57th from Freya St. to the Palouse Highway and on the north side of 57th from Ben Burr Rd. to Dearborn Rd. Completed: May 10, 2021.

Freya St: from 55th Av to 57th Av 
 
Flaggers May Be Present (Both Directions, All Lanes): Flaggers Present on Freya St from 55th to 57th.

57th Av: from Ben Burr Rd to Yale Rd 
 
Flaggers May Be Present (Both Directions, All Lanes): Flaggers Present on 57th from Ben Burr Rd to Yale Rd.


ROAD MAINTENANCE

(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)


Crack Sealing Cheney-Spangle Rd. from Wells Rd. to Town of Spangle
 Crew will be crack-sealing Cheney-Spangle Rd from the Wells Rd “Y” to the Town of Spangle. Expect flaggers. Completed: May 13, 2021.

Cheney-Spangle Rd.: from Wells Rd “Y” to Town of Spangle
 
Lane restrictions (both directions, all lanes): Motorists need to watch for flaggers.


\Euclid Rd Bridge Closure
 Euclid Rd Bridge is closed and a detour is in place. Replacing the bridge is the responsibility of the Burlington Northern Santa Fe Railroad. 

Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd 
 
Road Closed – Euclid Rd Bridge Closed

 

Grading and Prepping road for bentonite application on Stevens Creek Rd. from the Palouse Highway to end of road

Crews are grading and prepping Stevens Creek Road for bentonite application from the Palouse Highway to the end of the road. Completed: May 13, 2021.  

            Stevens Creek Road: from Palouse Highway to Jason Hill Lane.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Paving on Christensen Road from Deep Creek Road to Brooks Road

Crews are paving Christensen Road from Deep Creek Road to Brooks Road. Completed: May 17, 2021.

            Christensen Road: between Deep Creek Road and Brooks Road.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Paving on Yale Road from Woolard Road to Big Meadows Road

Crews are paving Yale Road from Woolard Road to Big Medows Road. Completed: May 12, 2021.

            Yale Road: between Woolard Road and Big Meadows Road.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Regraveling Bridges Road from Madison Road to Elk-Chattaroy Road.

Crews are regraveling Bridges Road from Madison to Elk-Chattaroy Road. Completed: May 13, 2021.

            Bridges Road: from Madison Road to Elk-Chattaroy Road.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Regraveling Frideger Road from Darknell Road to Madison Road.

Crews are regraveling Frideger Road from Darknell to Madison Road. Completed: May 13, 2021.

            Frideger Road: from Darknell Road to Madison Road.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Regraveling Madison Road from Frideger Road to Bridges Road.

Crews are regraveling Madison Road from Frideger to Bridges Road. Completed: May 13, 2021.

            Frideger Road: from Darknell Road to Madison Road.

Lane restrictions (both direction, all lanes): Motorists should slow down in work zone.

 

Spokane County crews are repairing potholes and grading gravel roads as the weather permits. 

 