ROAD CONSTRUCTION

Bigelow Gulch Rd - Phase 6

Improvements to Bigelow Gulch Road include clearing and grubbing, roadway excavation, embankment compaction, precast concrete drywells, culverts, pedestrian tunnel, structure excavation, illumination system. Completed: Spring 2023.

Forker Rd
: from Bigelow Gulch Rd to Progress Rd
Motorists should expect occasional delays (both directions, all lanes). Bigelow Gulch is open with a traffic signal.  

Progress Rd
: from Wellesley Av to Spokane Valley City Limits
Motorists should expect occasional delays (both directions, all lanes). Bigelow Gulch is open with a traffic signal.

Sullivan Rd
: from Upland Dr & Ct to Wellesley Av
Motorists should expect occasional delays (both directions, all lanes). Bigelow Gulch Rd is open with a traffic signal.
 
Sullivan Rd: from Wellesley Av to north City Limits of Spokane Valley
Motorists should expect occasional delays (both directions, all lanes). Sullivan Rd is open with traffic signals from the intersection of Wellesley and Sullivan to the city limits.
 
Wellesley Av: from Progress Rd to Tolford Rd
Motorists should expect occasional delays (both directions, all lanes). The intersection of Sullivan and Wellesley is open with traffic signals.

Euclid Road Bridge
Removing and constructing new bridge and road approaches; including asphalt pavement, signing, striping, erosion control, filter drain, beam guardrail, and miscellaneous structures. Project start TBD/tentatively begins in late December 2022.

Euclid Rd: from Bridge #1508 over Burlington Northern Santa Fe tracks to Lyons Rd. Road Closed: Bridge is closed. Use Detour.

West Terrace Stormwater Project

This contract provides for the improvement of Hayford Road and Richland Road by construction of a storm sewer system. The project includes catch basin, corrugated metal pipe, drop inlet, cutoff wall/pipe anchors, unsuitable pipe foundation, dewatering, and paving. Completed: July 1, 2023.

Richland Rd 
: from Hayford Rd to Hayford Rd
Lane restrictions (both directions, all lanes). Watch for flaggers

Hayford Rd
: from Westbow Rd to Richland Rd
Road CLOSED.

PRIVATE CONTRACTOR WORK BY PERMIT


Installation of Sewer and Water

My Excavation and Construction (509) 954-6488 crew is installing a sewer line and water main. Dates: November 7-28, 2022.
 
Phoebe Rd: from Front Rd to 37th Av
Road CLOSED on S Phoebe St. to the south of 37th Avenue.
 
                                                                                                                                       -###-