Road Construction and Maintenance Update
May 29-June 5, 2020
SPOKANE COUNTY, May 29, 2020 – Motorists are asked to slow down in work zones and watch for flaggers.
ROAD CONSTRUCTION
Bigelow Gulch Phase 5
Road closed for excavation work with local access only. End: 08/31/2020
- Progress Rd: from Forker Rd to Forker Rd
Blanchard Creek Road Culvert ReplacementReplace Existing Culvert-Start 6/15/2020. End: 10/31/2020.
- This work provides for the improvement of the Blanchard Creek Road. Work
includes the removal of the existing culverts and the construction of a new structure over Blanchard Creek.
Geiger Boulevard-Hayford Road to Soda RoadImprovement of Geiger Road includes roadway excavation, curb, drywells, signing and signals. End: 06/30/2020.
- Hayford Rd: from 53rd Av to Geiger Bv
Flaggers May Be Present (Both Directions, All Lanes): Road is open. Shoulder work, new traffic signal at Geiger and Hayford.
- Geiger Bv: from Hayford Rd to Thomas Mallen Rd
Flaggers May Be Present (both directions, all lanes): Road closed cast of Amazon. Thomas Mallen Closed. Detour using Hayford, 53rd, Electric. Amazon access via Geiger from Hayford.
- Geiger Bv: from Thomas Mallen Rd to Soda Rd
Road Closed: Road Closed to through traffic. Detour using Hayford, 53rd and Electric. Amazon access via Thomas Mallen & Geiger.
Mead-Mt. Spokane SewerInstall sewer, manholes, and road reconstruction. End: 07-31-2020.
- Day-Mt Spokane Rd: from US-2 (Newport Hy) to US-2 (Newport Hy)
Road Closed: Day Mount Spokane West of HWY 2 to Freya Road closed to through traffic.
Mill Road-Hastings to DartfordRoad Reconstruction. End: 10/31/2020.
- Mill Road is closed from Hastings to Dartford. Access to local properties will be
maintained. Detour using Hastings, US395, Wandermere and Dartford.
Liberty Lake Eastside Water ImprovementsReplace water line on Neyland. End: 09/30/2020.
Halme Construction: (509) 725-4200
- Neyland Rd: from Lakeside Rd to Gage St. Road Closed for Water Line Replacement
MAINTENANCE(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities) Asphalt Overlay on County RoadsAsphalt overlay on Mullinix Rd, from the Cheney City Limits on south to Martin Rd. Expect
flaggers and lane restrictions. End: 06/04/2020.
- Mullinix Rd: from UPRR Crossing #31222 (Cheney City Limits) to Martin Rd
Lane Restrictions (Both Directions, All Lanes): Asphalt overlay on Mullinix Rd, from the
Cheney City Limits on south to Martin Rd. Expect flaggers and lane restrictions.
Asphalt overlay on Martin Rd, from the Mullinix Rd on west to Lincoln County Line. Expect
flaggers and lane restrictions. End: 06/04/2020.
- Martin Rd: from Mullinix Rd to Lincoln County Line
Lane Restrictions (Both Directions, All Lanes): Asphalt overlay on Martin Rd, from the
Mullinix Rd on west to Lincoln County Line. Expect flaggers and lane restrictions.
Crack SealingCrack Sealing on Day-Mt. Spokane Rd from Hwy. 2 east to Big Meadows Rd. Expect flaggers and lane restrictions. End: 06/04/2020.
- Day-Mt Spokane Rd: from US-2 (Newport Hy) to Big Meadows Rd
Lane Restrictions (Both Directions, All Lanes): Crack Sealing on Day-Mt. Spokane Rd from Hwy. 2 east to Big Meadows Rd. Expect flaggers and lane restrictions.
Ditching operationsCrews will be ditching Dunn/Laurel with backhoe, ditching will be done in Valleyford and off Spring Valley Rd. Signs will be placed and flaggers used where necessary.
Euclid Rd Bridge ClosureEuclid Rd Bridge Closure and a detour route is in place. Work on bridge to be completed by BNSF.
- Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd.
Storm Drain/Culvert CleanoutCrews will be using a Vactor Truck in the Valleyford area to cleanout culverts and drywells. End: 06/25/2020.
- Use caution when around Vactor crews watch for flaggers.