Road Construction, Maintenance and Closure Update
August 9-15, 2019
SPOKANE COUNTY, August 9, 2019 – News release text.
CONSTRUCTION
Aero-Westbow Roundabout
Aero Rd: from Westbow Rd to Westbow Rd
Flaggers May Be Present (Both Directions, All Lanes): Intersection is open as a stop controlled roundabout. Completed: 08/31/2019
Bigelow Gulch 4
Clearing and grubbing, house demolition, adding culverts, guardrail and pavement. Road Open on the South alignment. Watch for flaggers, be prepared to stop. Completed: 9/30/19
Bigelow Gulch Rd: from Argonne Rd to Evergreen Rd
Flaggers May Be Present (Both Directions, All Lanes): REDUCED SPEED LIMIT 35mph. OPEN to traffic. *****There are weight restrictions of 16,000 pounds*****
Lehman Rd: from Bigelow Gulch Rd to Bigelow Gulch Rd
Flaggers May Be Present (Both Directions, All Lanes): Road is open, watch for flaggers, be prepared to stop.
Walnut St: from Bigelow Gulch Rd to Bigelow Gulch Rd
Flaggers May Be Present (Both Directions, All Lanes): Road is open, watch for flaggers, be prepared to stop.
Carnahan & Glenrose Roundabout
Finishing and landscaping the new roundabout. Road is Open, watch for flaggers, might be delays. Completed 9/30/19
Glenrose Rd: from Carnahan Rd to 21st Av
Lane Restrictions (Both Directions, All Lanes): Glenrose Road West of Carnahan is OPEN Local Access only. Trucks will be entering roadway.
Elk Chattaroy Bridge & Approach---***** BRIDGE CLOSED*****
Rehabilitation of the concrete deck by hydro-demolishing the existing slab, replacing the top reinforcing steel. The asphalt approaches will be raised to match the new deck elevation. Completed 10/31/19
Elk-Camden Rd : from Elk-Chattaroy Rd to Elk-Chattaroy Rd
Road Closed: BRIDGE IS CLOSED through August 28, 2019.
Geiger Boulevard-Hayford Road to Soda Road Project
Improvement of Geiger Road, Roadway excavation, Curb, Drywells, Signing, Signals. Completed 10/31/19
Hayford Rd: from 53rd Av to Geiger Bv
Road Closed: Road closed to through traffic from Geiger to 53rd starting 8/5/19. Detour Geiger, Thomas Mallen and Electric.
Geiger Bv: from Thomas Mallen Rd to Soda Rd
Flaggers May Be Present (Both Directions, All Lanes): Watch for closure in September
Mead Mt. Spokane Phase 2
Sewer Work in the area where Market and Yokes/ Pre-Project/Private Utility work underway. Completed 11/29/19
Mead-Mt. Spokane sewer
Moody, Ferrall, Freya Intersection will be CLOSED for sewer work. Local Access Only.
Freya St: from Moody Rd to Day-Mt Spokane Rd
Road Closed: Closed for Sewer Local Access Only
Ferrall St: from Lane Park Rd to Lane Park Rd
Road Closed: Closed for sewer work. Local Access only.
Moody Rd: from Freya St to US-2 (Newport Hwy)
Road Closed: Closed for sewer work. Local access only.
NHS Grind and Inlay. -County Homes (Cedar to Wall) and Hawthorne (Nevada to Parksmith)
Adding ADA Ramps, partial pavement grind and removal. Paving & Striping. Completed 10/31/19
Country Homes Bv: from Wall St to Cedar Rd
Lane Restrictions (Both Directions, All Lanes): Week of 8/12 Northbound lane closed with traffic shifted to parking and bike lane. On-Street parking restrictions.
Hawthorne Rd: from Parksmith Dr to Spokane City Limits
Road Closed: Full closure to through traffic from Nevada to Parksmith starting 8/13/19. Local access only. Watch for equipment.
PRIVATE CONTRACTOR WORK BY PERMIT
GEIGER ROAD RIGHT OF WAY IMPROVEMENTS
GEIGER ROAD RIGHT OF WAY IMPROVEMENTS - CLOSE GEIGER BLVD FROM HAYFORD TO THOMAS MALLEN. COMPLETED 8/29/19
Geiger Bv: from Hayford Rd to Thomas Mallen Rd
Flaggers May Be Present (Both Directions, All Lanes): GEIGER ROAD RIGHT OF WAY IMPROVEMENTS - Open to traffic with work still going on in the area. Watch for flaggers, might be delays.
INSTALL COUNTY SEWER - LITTLE SPOKANE DRIVE SEWER EXTENSION & INVERTED SIPHON
ROAD OPEN, watch for flaggers. Completed 11/30/19
Little Spokane Dr: from Little Spokane Ln to Shady Slope Rd
Flaggers May Be Present (Both Directions, All Lanes): Road Open
CONTINUING CLOSURE
Euclid Rd Bridge Closure
Euclid Rd Bridge Closure – After finding two critical failures in the substructure, Spokane County Public Works closed off access to the bridge which is owned by the Burlington Northern Santa Fe Railroad. Any repairs or replacement is the railroad’s responsibility. For more information, call (206) 625-6232.
Euclid Rd: from Bridge #1508 Over BNSF to Lyons Rd
Road Closed: Euclid Rd Bridge Closure
MAINTENANCE
(Road maintenance projects are subject to change due to weather conditions and other road maintenance priorities)
Asphalt overlay
Asphalt Overlay; Expect delays, flaggers and pilot vehicles to assist motoring vehicles through project.
Green Bluff Rd: from Day-Mt Spokane Rd to Day-Mt Spokane Rd
Lane Restrictions (Both Directions, All Lanes): Asphalt Overlay; expect flaggers and delays. 08/12/2019 - 08/15/2019
Hazard Road Closure due to washouts
Hazard Rd closed due to washouts. Area to remain closed until repaired.
Hazard Rd: from Dartford Dr to Rivilla Ln
Road Closed: Hazard Rd closed due to washouts. Completed 09/26/2019
Pavement Removal & Replacement
Farwell Rd: from Darknell Rd to Madison Rd
Lane Restrictions (Both Directions, All Lanes): Pavement Removal and Replacement, expect flaggers and delays. Completed 8/15/19
Darknell Rd: from Farwell Rd to Hopper Rd
Lane Restrictions (Both Directions, All Lanes): Pavement Removal and Replacement, expect flaggers and delays. Completed 8/15/2019
Peck Rd: from Forker Rd to Hopper Rd
Lane Restrictions (Both Directions, All Lanes): Pavement Removal and Replacement, expect flaggers and delays. Completed 8/15/2019
Stoneman Rd project
Stoneman Rd: from Parksmith Dr to Argonne Rd
Road Closed: Sweeping, fog seal, then striping. Completed 8/15/2019
CITIZEN EVENT BY PERMIT
QUEST SUNDAY FEST - AUG 11TH
QUEST SUNDAY FEST - AUG 11TH - CLOSE NORTHBOUND TURN LANE AT HAYFORD AND NORTHERN QUEST LN FROM 10PM THE NIGHT BEFORE EVENT UNTIL 6:30 PM THE DAY OF THE EVENT. https://www.northernquest.com/quest-sunday-fest
Hayford Rd: from Northern Quest Dr to Northern Quest Dr
Lane Closed (Northbound, Center Lane): CLOSE NORTHBOUND TURN LANE AT HAYFORD AND NORTHERN QUEST LN FROM 10PM THE NIGHT BEFORE EVENT UNTIL 6:30 PM THE DAY OF THE EVENT.
TRIFUSION HOT SUMMER NIGHTS
5K RUN STARTING/FINISH AT MEAD HIGH SCHOOL 8/14, & 8/21 4:30 pm - 8 pm
JILLIAN: (509) 276-5005
http://www.tri-fusion.com/hsn/event-info/
Hastings Rd: from Ruby Rd to Mill Rd
Delay (Both Directions, Shoulder): RUNNERS ON THE ROAD FROM 6-9PM
08/07/2019 - 08/21/2019
Mill Rd: from Hastings Rd to Addison St
Delay (Both Directions, Shoulder): RUNNERS ON THE ROAD FROM 6-9PM
08/07/2019 - 08/21/2019
Addison St: from Mill Rd to Farwell Rd
Delay (Both Directions, Shoulder): RUNNERS ON THE ROAD FROM 6-9PM
08/07/2019 - 08/21/2019
Farwell Rd: from Addison St to Ruby Rd
Delay (Both Directions, Shoulder): RUNNERS ON THE ROAD FROM 6-9PM
08/07/2019 - 08/21/2019
Ruby Rd: from Farwell Rd to Hastings Rd
Delay (Both Directions, Shoulder): RUNNERS ON THE ROAD FROM 6-9PM
08/07/2019 - 08/21/2019