What is Construction Stormwater Permit Coverage?

If your construction project cumulatively disturbs one or more acres of land through clearing, grading, excavating, or stockpiling of fill material, you may need construction Stormwater Permit Coverage from the Washington State Department of Ecology (DOE). This applies even if the project is being constructed in phases of less than one acre. Spokane County cannot determine whether Permit Coverage is necessary. It is your responsibility to apply for coverage. For more detailed information, call 360-407-6437 or visit their website.

visit their website.

Show All Answers

1. How do I apply for a building permit?
2. What construction codes are in effect in the unincorporated areas of the County?
3. What design criteria do I use for designing a building?
4. How long is my permit good for?
5. What is the basic minimum snow load for Spokane County?
6. Do I need a permit for a fence?
7. Do I need a fence around my swimming pool?
8. Is there radon in Spokane County?
9. Do I have to mitigate my home for radon?
10. How do I apply for a manufactured home permit?
11. What is an egress window and when is it required?
12. What hours can construction noise take place?
13. How do I get an address assigned to my property?
14. Where do I get my electrical permit?
15. How high can a fence be?
16. How often can you amend the Comprehensive Plan?
17. What are my setbacks?
18. What are Critical Areas?
19. What requirements apply within critical Areas?
20. Where can I find information about minimum lot sizes in Spokane County?
21. What are Critical Areas?
22. What requirements apply within Critical Areas?
23. Where can I find information about minimum lot sizes in Spokane County?
24. What is Construction Stormwater Permit Coverage?
25. How do I obtain a Food Establishment permit?